Testing every layer before sign-off. DHCP per VLAN, guest isolation, WAN failover, Wi-Fi coverage and roaming, spanning tree, PoE, IGMP and PTP clock lock.
QA is my job, and it’s the part I care most about. A schedule turns “it seems fine” into evidence. It catches the faults that only show up under load or after a power cut, and it gives the client and the next engineer a clear record of what was proven.
Written test schedules, Afara, Dante Controller, switch and Wi-Fi management tools.