Everything on board had to run on one converged network: multi-zone audio, control, TV, and separate owner and guest internet, with connectivity that stays up at sea.
Core and switching. A Cisco Layer 3 core switch handles inter-VLAN routing and DHCP for the Home, Guest, AV-over-IP and Crestron NAX VLANs. A dedicated Netgear switch carries the AV traffic, with a Cisco rack switch and eight PoE edge switches in the cabins.
Wireless and WAN. Nine Ruckus access points on trunk ports serve the owner and guest SSIDs. A Pepwave router with two Starlink services (land and marine) provides WAN failover.
Security. The guest VLAN is isolated from the private network with an inbound ACL. TV, AV and control each sit on their own VLAN, and devices are managed over SSH only.
AV over IP. Four Crestron DM NAX units, five Bluetooth input plates and eight Dante-enabled amplifiers run on AES67/Dante streams with PTPv2 clocking, controlled by a Crestron CP4-R.
MST with the core as root bridge; loopback detection with err-disable auto-recovery; IGMP snooping and querier on the AV VLAN; unregistered multicast filtering; QoS trusting 802.1p for AV traffic; DHCP reservations.
The design took TV audio over HDMI ARC into the Dante amplifiers, but the Crestron driver for the Dante devices didn’t behave reliably with that set-up. We found it while commissioning the system at our workshop, before it went on board, and I switched the TV audio to optical, which proved more dependable. It cost some commissioning time, but the problem was solved before the system reached the yacht.
An 18-point commissioning schedule: DHCP per VLAN, guest isolation, WAN failover, Wi-Fi coverage and roaming on every deck, spanning-tree root, PoE draw, IGMP querier and snooping, PTP clock lock, a 30-minute dropout test and switch power-cycle recovery. All tests passed. The system was handed over with configuration backups, a topology drawing and an as-built commissioning record.
Simplified diagram drawn for this page, showing device types and VLANs only.
Fig 1. Patch panel terminations and power, dressed and labelled before the rack left the workshop.
Fig 2. Power leads labelled by circuit and dressed along the frame.
Fig 3. Rear of the rack, with power distribution at the top and the amplifiers below.
Fig 4. Amplifier tier, with speaker runs gathered into braided looms.
Fig 5. Speaker outputs, each labelled so every run can be traced at handover.
Fig 6. The finished rack on its rails, ready to go on board.