IP schedules, topology and connectivity drawings, as-built commissioning records and configuration backups for every handover.
A system is only as supportable as its documentation. Good records mean the next engineer, or me in a year’s time, can understand the system quickly, restore a failed device from a backup, and make changes safely.
IP schedule and test-schedule templates, topology drawings, configuration backups, Afara reports.