CORE CAPABILITY

Documentation

IP schedules, topology and connectivity drawings, as-built commissioning records and configuration backups for every handover.

How I approach it

  1. Plan on paper first. IP schedules and topology drawings are written before configuration starts.
  2. Keep them current. Documents are updated as the system changes, so they match what was built.
  3. Hand over everything. As-built commissioning records, IP schedules, topology and connectivity drawings, and configuration backups.

Why I work this way

A system is only as supportable as its documentation. Good records mean the next engineer, or me in a year’s time, can understand the system quickly, restore a failed device from a backup, and make changes safely.

Tools I use

IP schedule and test-schedule templates, topology drawings, configuration backups, Afara reports.